Coating Solutions for BUR / Modified Cap Sheet
Choose a surface. Pick a coating. Send your project.
- Roof or deck
- Coating
- DocumentsOptional
- Project
BUR / Modified bitumen
Step 2 of 4
Which coating would you like?
Choose an option. Our team will confirm the right system for your project.
Not sure? Call 408.280.7733 and we’ll help.
Read the full BUR / Modified Cap Sheet coating guide
Coating Solutions for BUR / Modified Cap Sheet
Granulated and smooth asphalt roofs can be restored when the assembly is sound, dry, repairable, and properly prepared. Primer selection must account for asphalt oil bleed-through before the acrylic or silicone weathering surface is installed.
- Surface
- BUR / Modified Cap Sheet
- Coating choices
- Acrylic + silicone
- Check the roof
- Condition · moisture · adhesion
- Files included
- Specifications · data · safety · drawings

Acrylic steps
Follow the current written specification for preparation, coverage, film thickness, and installation.
Preparation guidance for your installer
Common roof concerns
- Asphalt oil bleed-through and discoloration
- Blisters, open laps, splits, or loose granules
- Alligatoring around details and transitions
Field preparation
- Repair blisters, splits, and loose laps
- Clean and dry the asphaltic surface
- Use Bleed Blocker before base or top coats
Release checkpoints
- Moisture survey is acceptable
- Repairs are flush and reinforced
- Bleed-blocking film is continuous
Need an estimate or more detail?
Use these resources when you need more detail, then return to the project steps.
Answers before the roof brief.
Use these answers for planning, then follow the current written specification for the project.
Can an existing BUR / Modified Cap Sheet roof be coated?+
A BUR / Modified Cap Sheet roof may qualify when the assembly is identified, sound, dry, repairable, properly prepared, and proven compatible through project-specific testing. Wet or unsound areas must be addressed before coating.
What preparation does Coating Solutions for BUR / Modified Cap Sheet require?+
Preparation depends on the exact substrate and condition. Inspection, moisture review, cleaning, drying, repairs, detail work, and representative adhesion testing come before the final primer and coating sequence.
How is the material quantity calculated?+
The estimator uses measured roof area, detail length, system family, planning term, and a waste or texture allowance. Actual ordering must follow current coverage rates, specified film build, surface profile, and field verification.
Which technical documents belong in the project file?+
Start with the system specification, then include the current product data, safety data, applicable detail drawings, approvals, warranty requirements, and any written project-specific instructions.
When should the technical team review the roof?+
Request a review whenever the substrate is uncertain, moisture or drainage is a concern, adhesion results vary, prior coatings are present, warranty coverage is planned, or field conditions differ from the published system.
