METACRYLICS / Substrate-first planning tool
Estimate Materials.
Choose the existing roof, system family, planning term, field area, and detail length. Get a clear layer-by-layer allowance to review with your Metacrylics representative.
FIELD SYSTEMS · 1976—NOW1 · Roof2 · System3 · Measurements
01
What roof is there now?
The substrate controls cleaning, adhesion, and primer choice.
02
Choose the system family.
Start with the performance target; a Metacrylics rep will confirm the final assembly.
03
Set term and field quantities.
Enter measured roof area—not building footprint—and include detail length.
Need a project-specific answer?
