METACRYLICS / Substrate-first planning tool

Estimate materials without the guesswork.

Choose the existing roof, coating path, planning term, field area, and detail length. The layer-by-layer allowance updates as you work.

FIELD COATINGS · 1976—NOW
1 · Existing roof2 · Coating system3 · Measurements
01

Choose the existing roof.

This sets the starting preparation and primer allowance.

02

Choose a coating path.

Explore a material option. Our team confirms the right system for your roof.

03

Enter the measured roof area.

Add seam and penetration length. The allowance updates immediately.

YOUR MATERIAL PREVIEW

EPDM

Motion is off to match your device preference. Use the controls to inspect the roof.

Illustrative material selection, not an installation specification. Surface preparation and final build must be confirmed.

Extreme Performance Plus Acrylic White packaging
EXPLORE A FINISH OPTIONExtreme Performance Plus Acrylic WhiteProduct details & technical sheets →
Open this roof’s coating guide →

Need a project-specific answer?

Send the roof to our technical team.

Start a Project Review →